Kaiser Permanente — Emergency Department Expansion

Location

Fresno, CA

Project Type

Market

A-C Electric Company was selected as the electrical partner for Kaiser Permanente’s high-priority Emergency Department Expansion in Fresno, delivering full design-assist and design-build services. Our scope included critical power infrastructure upgrades from the Central Utility Plant (CUP), a new electrical duct bank, and state-of-the-art lighting with antimicrobial UVA/UVB technology. We installed essential systems including fire alarm, security, CCTV, nurse call, and power for mission-critical imaging equipment. A-C’s in-house BIM coordination, innovative problem-solving, and prefabrication strategies ensured seamless integration with the operational Level 1 trauma center while enhancing safety, minimizing disruptions, and reducing project costs.

Let’s power your next project.

More Projects

BRO574 COLUMN H3 IDF Large

Fullfillment Center

ACEC ZD Onsite 2025 01 DSC 4551 Large (1)

Clovis Unified School District – Terry Bradley Education Center

BR0584 IMG 2106 Large Featured

CAPK Food Bank Expansion