Sun-Maid – Solar PV System Installation

Location

Visalia, CA

Project Type

A-C Electric Company provided a turnkey design-build solution for a solar photovoltaic (PV) generating facility at Sun-Maid’s site. Our scope included complete installation of PV modules, mounting systems, inverters, disconnects, transformers, conduit, and wiring. We delivered all permitting and engineering services, along with a web-based monitoring system and five years of cellular data service. To ensure long-term performance, the project included a one-time post-commissioning inspection and module cleaning. This solar upgrade supports Sun-Maid’s sustainability goals with a seamless integration into their existing infrastructure.

Let’s power your next project.

More Projects

BR0584 IMG 2106 Large Featured

CAPK Food Bank Expansion

BR0560 IMG 0043 Large

Isabella Lake Dam, Army Corps of Engineers

VR0324 IMG 1196 Large

National Retailer Cold Storage Facility – Confidential Client